Rig Activity Levels Out In April
The active rate of drilling rigs in Western Canada levels out in April — with 40 to 42 per cent of the fleet working for the final three weeks of the month, according to Rig Locator.
The active rate of drilling rigs in Western Canada levels out in April — with 40 to 42 per cent of the fleet working for the final three weeks of the month, according to Rig Locator.